Monday, July 19
Sloooowly but surely...
All of the asbestos siding has been removed and properly disposed of.
The black material on the house now is tar paper, which will be removed.
The east & west sides of the house (in progress)...
The first window, on the side, will be replaced with a fireplace.
A window on each side of the fireplace will then be installed.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)